Walter Reed Medical Center

Project Details:
Client:Walter Reed National Military Medical Center
City, State:Bethesda, MD
Sector(s):Healthcare, Labs & Research Facilities, U.S. Federal
Service(s) Performed:General Contracting

Allen & Shariff furnished all labor, materials and equipment necessary to complete the replacement of the steam & condensate piping, as well as replace the heating hot water lines in Buildings 9 & 10 at the National Naval Medical Center in Bethesda, MD.  The buildings were occupied during the performance of work which included:

Removal of the existing piping and replacement with new low pressure steam condensate piping which included 60 lbs of steam return piping, steam trap’s, valves and fittings throughout the entire buildings.

Removal of the existing piping and replacement with new heating hot water piping, heat exchangers, pumps, valves and fittings throughout the entire layout of both buildings.

Contact UsContact Us