Allen + Shariff Corporation provided the design engineering services to replace three existing 400 kW emergency generators with three 600 kW generators (on board paralleling) and to remove existing paralleling controls. New emergency distribution equipment will back feed the existing emergency distribution, with provisions for future distribution and a fire pump. A temporary generator was required throughout the duration of the project. The new generators have been load banked prior to being placed in service. Architecturally, new louvers were installed for unit mounted radiators and the screen wall for the existing remote radiators were demolished.

Project Details

Client: DRS Architects

Square Footage: N/A

Services: MEP Engineering