Uniontown Hospital Lab Renovation Phase II

Allen + Shariff provided MEP/FP engineering services for a lab renovation at Uniontown Hospital, located in Uniontown, PA. The project, which was split into two phases, included the renovation of offices, transcription lounges and locker rooms, a blood bank, phlebotomy, cystology, histology storage spaces and supply rooms. A new lab air handling unit was installed adjacent to the existing unit to continue current lab operations. The new air handling unit included a run around heat recovery coil, a new exhaust system, new DDC controls, and proper outside air to reduce the overall negative air impact on the existing facility. Electrical upgrades included new LED lighting, a new fire alarm, and plumbing systems extended to the existing system with new fixtures. In addition, we relocated the histology and cystology lab areas to a new supply room and new central storage.

Project Details

Client: RM Creative

Square Footage: 5,050

Services: MEP Engineering

Project Gallery