Oak Orchard Boys and Girls Club
Allen + Shariff provided mechanical, electrical, and plumbing engineering services for this 5,000 SF two-story addition and renovation. The $900K (est.) project includes six (6) classrooms and four (4) single bathrooms and a second-floor multipurpose room to house a teen program. The design aimed to create optimal environments for the youth community. The new MEP systems will provide the Boys and Girls Club with lower operating costs and decreased maintenance issues.
We installed energy efficient Multizone Heat Pump HVAC systems in new classroom spaces and a new IT closet, ensuring temperature control, and occupant comfort.
Four single occupancy restrooms were installed, two on the first floor and two on the second of the new addition. New water closets and lavatories were provided and connected to existing sanitary, vent, and domestic water systems. A new domestic hot water recirculation pump was sized and installed in conjunction with a hot water return loop. The existing grease interceptor was relocated outside of the new addition’s footprint.
The existing electrical service was modified to allow for the installation of new 600A 240/120V 1Ø/3W service entrance that serves the existing distribution panels. The addition and renovated areas were provided with new LED lighting including linear and down lights. The existing fire alarm system was extended to the new addition and a new fire sprinkler riser was installed.
Photo Credit: Davis, Bowen, & Friedel, Inc
Project Details
Client: Davis, Bowen & Friedel, Inc
Square Footage: 5,000
Services: MEP/FP Engineering